Unit S23, The Nucleus, Brunel Way, Dartford, Kent DA1 5GA

Case study

Aldi, Orpington

Structural strengthening as part of a store refurbishment, ready for new interior workspaces.

Case study

Description of works

Structural strengthening works carried out as part of the refurbishment, to allow new interior workspaces to be created. The works focused on reinforcing the existing structure so it could support the new internal layout and everything that comes with it.

This strengthening was an important part of preparing the building for its updated use, giving a more robust structure while working within the limits of the existing premises. The result was a reinforced structure ready for the planned workspace alterations.

View project photos

Gallery

Project photos