Supply and installation of structural steelwork to form the complete framework for a lithium battery storage facility at Sainsbury’s Northampton. The project called for a purpose-built steel structure giving a strong, stable and durable framework suited to the facility’s needs.
The scope covered the supply of the structural steel and its installation on site, bringing the steelwork together to create the complete supporting structure. Delivered within a two-week supply and fit programme, the works gave a robust structural solution for the battery storage facility and its ongoing use.