Case study
Description of works
Supply and installation of structural steelwork, including cold-rolled purlins, to give a robust and efficient framework tailored to the project. The scope covered fabrication and welding of the steelwork in our workshop, followed by fitting on site.
Building the cold-rolled purlins into the structure helped deliver a practical, durable solution for the building. The programme was three weeks of workshop fabrication and welding and a further three weeks of fitting, bringing together the prepared steel and the installation on site.
