Case study

Aldi, Ipswich

Structural steelwork with cold-rolled purlins, made in our workshop and fitted on site.

Case study

Description of works

Supply and installation of structural steelwork, including cold-rolled purlins, to create a strong, durable and efficient structural framework for the project. The scope included fabricating the steel in our workshop, followed by supply and fitting on site.

The cold-rolled purlins form an integral part of the framework, giving support within the overall steelwork. With three weeks of workshop fabrication and a further three weeks of supply and fitting on site, the works combined off-site preparation with installing a structural solution suited to the project.